Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
References
Languages
Timeline
Generic
Alejandro Ramirez Aguilar

Alejandro Ramirez Aguilar

Izcalli

Summary

Analytical and results-oriented senior program manager with progressive career history the field. Collaborative and motivating leader with significant experience managing, supervising and directing large teams of contractors and remote personnel. Dedicated with strong work ethic and excellent technical problem-solving and troubleshooting skills.

Accomplished Cost Engineer highly knowledgeable about assessing projects. Brings strong track record of success in applying engineering principles to improve implementation and ongoing operations. Well-versed in entire project lifecycle and related costs.

Overview

26
26
years of professional experience
1
1
Certification

Work History

SR. FINANCIAL / Budget LRPC NA REGION

STELLANTIS
Mexico City
07.2022 - 07.2024

Economic function that drives efficiency of engineering / planning budgets for NA (North America) programs, prioritize most profitable products while proposing changes on LRP, Communication speed making sure all stakeholders are correctly involved on decisions

  • Consolidated R&D CAPEX budget (M€/FTE) for NA region, per function, aligning with target established at Global Product Committee (GPC) and Group workload FTE
  • Spearheaded efficient information flow between Regional Technical Canters across different continents and VEMO, while rectifying any discrepancies between regional R&D workload and Top-Down Targets.
  • Enhanced program analysis and revisions for GPC L3 programs in the North America Region.
  • Provided assistance in R&D/Capex spending, workload analysis, and identification of target achieving opportunities.
  • Achievements
  • Converged budgets in alignment with 2023 annual plans by adhering to the set spending targets, limiting R&D and CAPEX budget variances within 5% as per NA region objectives.

System Cost Engineering Manager

STELLANTIS
Mexico City
09.2013 - 06.2022

Created cost estimates for new/modified parts during initial costing phases and product action bulletins. Developed various scenarios and conducted Loop 0 assessments, focusing on metal stamping process, coating, plastic injection parts, electrical/electronic harnesses assembly/testing, and a wide range of component assembly.

  • Maintained efficient communication with buyer to ensure successful attainment of company target costs.
  • Review cost methodology with buyer commodities that tend to have gaps from target to PO placement.
  • Navigated cost negotiations for parts and tools with suppliers, assisting buyers in response to new components and modifications by analyzing quotes and PBDs from the supplier.
  • Enhanced technical solution fidelity on cost loops with engineering by giving clear direction regarding the minimum requirements for specific commodities.
  • Evaluated and assessed supplier quotations for parts based on PBDs, which included procurement of materials, raw material processing, assembly processes, machine rates, labor rates, cost burden, scrap, profit margins, SG&A expenses, packaging costs and logistics fees.
  • Collaborated with the Cost Engineer to supervise and support in verifying tool asset existence, valuation, and collaboration with Firm Price PO.
  • Increased technical solution accuracy and cost effectiveness through proactive collaboration with engineering, offering comprehensive guidelines for specific commodity demands.
  • Supervised and supported the System Cost Engineer in Stellantis Owner Vender Tooling, collaborating on Firm Price PO's and verifying the existence and valuation of tool assets.
  • Conducted audits at suppliers' facilities, identifying savings opportunities using lean manufacturing techniques.
  • Streamlined TPO processing by implementing firm price PO and asset verification methods.
  • Complied with CN cut-off dates and collaborated to ensure accurate documentation of all CN savings in piece cost and tooling. Verified correct tooling line-ups for each CN prior to collaboration flag completion.
  • Supported benchmarking activities for Technical Cost Reduction (TCR).
  • Ensured compliance with all requirements of SOX (Sarbanes- and Oxle) Audits.

Achievements.

  • Exceeded expectations with a demonstrated ability to achieve strong Project Economic Performance in 2022 by achieving direct material and vendor tooling cost convergence at supplier nomination alongside accurate TKOM calculation.
  • Generated $6.4M in savings for SCE Sta. Fe (Stellantis Mexico Group) through tool cost avoidance in the 2021 Collaboration and Verification process.
  • Generated $1M in savings by collaborating on cost verification processes from 2013 to 2015.

Program Manager

STELLANTIS
Mexico City
02.2007 - 08.2013

Manage/lead engineering and cross-functional teams in the launch of new vehicles, carryover, and federal regulatory compliance initiatives. Meet program milestones, budgets, and quality objectives set by product scopes and top management.

  • Managed production launch programs for PT, JC, F500, W2, and P6 projects at Stellantis Mexico Engineering.
  • Led coordination activities for the development of Pilots Construction S1, S2, and J1.
  • Coordinated activities for China Program Certification (CCC).
  • Conducted VLO (Interference & Contacts Audit), tracking and following up on open issues for resolution.
  • Coordinated construction of F500 Shanghai Auto show units.

Achievements

  • Achieved significant cost reductions of $2.5M through the re-localization of parts and compounds for Venezuela Programs in 2012CY.
  • Reduced obsolescence costs generated by Build out through coordination with Engineering, Assembly Plant, and Production Control. Enabled reutilization in other vehicle families and use as service parts.

Project Coordinator

KIMBERLY CLARK
02.2006 - 01.2007

Managed multidisciplinary departments overseeing installation, setup, and operation of manufacturing equipment for massive diaper products.

Achievements

  • Installed and set up production means in accordance with corporate timing and budget assigned by the Board of Directors.

Program Manager

WOODBRIDGE
Estado De Mexico
06.2005 - 01.2006

Leading and managing cross-functional groups including Engineering, APQP, Manufacturing, Labs, Tool shops, and Design to ensure successful launch of new programs and compliance with PSW/PPAP process requirements in the Automotive Industry (Seat Foams).

  • Coordinated and followed up on activities involved in launching and producing seat foam parts. This included tool construction, test validation, and budget control.

Achievements

  • Successfully achieved product launch targets by ensuring adherence to customer requirements, PSW/APQP, and meeting deadlines for date, cost, and quality.

Program Manager

HELLA
Estado De Mexico
09.1999 - 05.2005

Effectively oversaw the coordination of various departments including Product Engineering, Product Design, APQP, Manufacturing, purchasing as well as Dimensional Measurement Labs , TestingProduct Performance labs ,and Tool Shops to ensure adherence to PSW/PPAP process expectations.

  • Successfully launched new programs and performed financial and technical studies for automotive industry lighting products.
  • Managed activities and actions for the launch of Automotive lighting Products, ensuring compliance with customer requirements.
  • Conducted feasibility studies on technology and capacity while controlling and directing a multi-disciplinary, multi-national workforce.
  • Launched Product and Assembly Line manufacture on schedule, meeting customer's established Costs, Time, and Quality requirements.
  • Achieved the financial goals, including profit, revenues, and payback period, for each project.
  • Completed projects within assigned budgets, including the last project with a budget of 5 million Euros.

Achievements

  • Launched Product and Assembly Process on schedule, meeting federal regulations, customer requirements, and company objectives.
  • Achieved projected profit and payback periods for all projects.
  • Achieved assigned budgets for multiple projects, with the last project having a budget of 5 million Euros.

Tool Shop Supervisor

DUROPLAST
Estado De Mexico
04.1998 - 08.1999

Managed maintenance and repair of molds and injection tools for plastic parts in the Automotive Industry.

  • Ensured operations were in alignment with mold and injection tool functionality and design.
  • Programmed preventive maintenance tools
  • Coordinated activities for engineering changes in Tool Shop.

Achievements

  • Reduced overtime for corrective maintenance
  • Implemented predictive maintenance methods to reduce failures in tools.
  • Achieved cost reduction for molds' spare parts through effective price renegotiation
  • Implemented instructive and procedures aligned with QS9000 guidelines.

Education

Master Degree - Business Management & Financial

01.2023

Bachelor Degree - Mechanical Engineer

Instituto Politécnico Nacional
01.1993

Skills

  • Ability to make decisions
  • Attitude
  • Collaborative
  • Leadership skills
  • Accountable
  • Resilient
  • Speed & Efficiency
  • Vision
  • Integrity
  • Assess vendor tooling
  • Audit of supplier
  • Calculate & Analysis of Margins New part
  • Consolidation TPC (Total Production Cost) of Project
  • Controlling expenses
  • Economic and financial basics

Accomplishments

  • CST Costing System at Stellantis
  • NX – Teamcenter visualisation
  • Lotus Note
  • Courses and Training in Tier 1 Companies
  • Program Management Skills
  • Gnoatto Cons
  • International, Mexico
  • 2004
  • Failure Method Effect Analysis FMEA
  • D.S & R Consultants and Associates, Mexico 2004
  • Analysis Problems and Root Cause Analysis
  • Kepner and Tregoe Mexico 2004
  • Process Part Approval Production PPAP - D.S & R Consultants and Associates Mexico 2004
  • Managements 9 Gates Project Phases - HELLA Lippstadt Germany 2005 -Geometric tolerances and Dimensions Automotive Ind - Dynamic Variations Corporations Mexico 2004
  • Engineering Change Management (SAP)
  • Gedas México 2003
  • FMVSS & SAE Norms
  • Hella Mexico
  • 2003
  • STELLANTIS (Internal courses) Training online
  • Part Flag Awareness Training
  • Stellantis 2024
  • Record Information Handling
  • Stellantis 2023
  • Business case development
  • Stellantis 2022
  • BEV Market evolutions Stellantis 2023
  • NHTSA regulatory norm
  • Stellantis 2022
  • Negotiations Skills
  • 2022
  • Stamping parts and dies cost Assessment
  • Stellantis 2021
  • Six Sigma Introduction
  • Stellantis 2014
  • CTC STELLANTIS @ Auburn Hills Michigan US
  • Cost Loop Process.2015 - Should Cost Modelling
  • 2015 - Micro Standards (Seats, HVAC & Soft Trim)
  • 2015 - Cost Methodology for SCIE Engineers.2015 - Tooling Process Collaboration & Verification.2015
  • STELLANTIS Mexico
  • Imparted by Oakland Community College
  • Getting Things Done
  • 2014
  • Collaborate for Success
  • 2014
  • Negotiations Skills
  • 2014
  • STELLANS Mexico Harvard Management Mentor - Training Online
  • Project Management
  • 2013 -Finance Essentials
  • 2013 -Customer focus
  • 2013 -Strategy Execution
  • 2013 -Team Leadership
  • 2013 -Leading and motivating
  • 2013 -Crisis management
  • 2014 -Delegating
  • 2014 -Budgeting
  • 2014 -New Manager Transition
  • 2014 -Global Collaborations
  • 2014, Internal control & SOX
  • Knowledge of the Monitoring of free cash flow activities
  • Management and optimization of the production
  • Management and optimization of the project
  • Operation Budget costing and forecasting
  • Profitability Analysis
  • Tangible Investment Management
  • Program Management
  • Budgeting and cost control
  • Change Management / Transformation
  • Communication and Presentation
  • Mange the core team vehicles system for CKD, DKD, SKD Projects
  • Should cost evaluation for Make/Buy analysis.

Certification

  • MS OFFICE + Project & ACCESS Proficiency
  • Creation Data Base MS Access to manage projects
  • SAP Engineering and Procurement Modules.

References

REFERENCES. Marco Caprioglio. (Last Mgr. at Stellantis) marco.caprioglio@stellantis.com +335 7892292 Italy. Brian Rentz. (Previous Mgr.) brian.rentz@stellantis.com +1 248 9317265 USA. Héctor Acero. (Previous Mgr.) haceroo1@ford.com +52 5544508532 Mexico. 2

Languages

  • Spanish Native.
  • English Fluent.

Timeline

SR. FINANCIAL / Budget LRPC NA REGION

STELLANTIS
07.2022 - 07.2024

System Cost Engineering Manager

STELLANTIS
09.2013 - 06.2022

Program Manager

STELLANTIS
02.2007 - 08.2013

Project Coordinator

KIMBERLY CLARK
02.2006 - 01.2007

Program Manager

WOODBRIDGE
06.2005 - 01.2006

Program Manager

HELLA
09.1999 - 05.2005

Tool Shop Supervisor

DUROPLAST
04.1998 - 08.1999

Master Degree - Business Management & Financial

Bachelor Degree - Mechanical Engineer

Instituto Politécnico Nacional
Alejandro Ramirez Aguilar