Summary
Overview
Work History
Education
Skills
Languages And Software
Personal Information
Timeline
Generic
Carlos Eduardo Montelongo Pérez

Carlos Eduardo Montelongo Pérez

Mechatronics engineer
San Juan del Río

Summary

Results-oriented automation engineer with a strong focus on start-up, support, and continuous improvement of manufacturing processes. Skilled in programming various controllers and intervening in the hardware aspect of equipment to ensure compliance with client specifications for new projects and engineering changes. Interest in equipment maintenance to optimize operational efficiency and contribute to the overall goal of production deliveries, prioritizing productivity, efficiency, and safety.

Overview

13
13
years of professional experience
7
7
years of post-secondary education
1
1
Language

Work History

Automation Engineer

GG Cables and Wires México
01.2018 - Current
  • Responsible for sequence programming in PLC and drivers in equipment such as: Assembly boards for automotive harnesses, plasma welding machines, TOX presses, Schmidt servopress, induction welders, automatic tapers, tube shrinking machines, and tube cutting machines. wire.
  • Planning, installation and commissioning of new production equipment for European and local suppliers.
  • Optimization and continuous improvement of production processes and existing machines to increase productivity, efficiency and safety.
  • On-site and remote support to production and maintenance area for troubleshooting (call duty).
  • Program sequence changes resulting from ECN's, deviations and improvements to the manufacturing process, all previously approved according to established standards and procedures.
  • Generate documentation on new technologies to train the maintenance area and provide effective support.
  • Parameterization of processes by ECN or new product introduction, this can include hardware and software points, modification of part number recipes, changes in product databases.
  • Collaboration with other technology areas in the design of new processes or changes in the product, this can include hardware and software points.
  • Support for local Visualization software (HMI) for repair and creation of new workstations, review of SQL and Access databases for proper functioning.
  • Direct collaboration and support with colleagues from the Poysdorf, Austria plant.
  • Participated in root cause analysis efforts to resolve complex issues related to automated equipment performance.
  • Approval of suppliers and projects in the field of automation technology (hardware, software, concept, ...)

Maintenance Leader

GG Cables and Wires México
09.2014 - 01.2018
  • Creation and administration of periodic maintenance plans in SAP for production equipment such as assembly boards, welding machines, cutting machines and presses.
  • Support and planning in preventive and corrective maintenance for automotive harness production equipment.
  • Control of spare parts and consumables in SAP, low and high of part numbers, consumption control.
  • Optimization and continuous improvement of production processes and existing machines to increase productivity, efficiency and safety.
  • Coordinated with other departments to schedule downtime events efficiently so as not to disrupt overall production timelines or goals.
  • Management of maintenance area indicators such as availability, MTBF and MTTR, as well as application of actions to improve the general objectives of the department.
  • Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.
  • Supervised employee performance, preventive maintenance, and safety.
  • Fine-tuning of automotive harness production equipment for its release into series production.

Maintenance of machinery such as component assembly lines, METZNER automatic cutting and stripping machines, 15-ton TOX presses and Fronius plasma welding machines. Engineering changes in assembly lines taking into account quality assurance, guarantee and ergonomics for operators.

Electrical Controls Technician

TecnoRampa S.A De C.V.
03.2013 - 09.2014
  • Design, programming and implementation of control panels for industrial, automotive and residential elevators.
  • Implementation of special functions according to customer needs from electronic functions to mechanical functions, such as remote controls, event logs and access control, among others.
  • Continuous improvement process on existing products to improve performance and aesthetics.
  • Developed comprehensive documentation for all electrical control systems, facilitating efficient troubleshooting and maintenance activities.


Development and implementation of a control panel for an industrial freight elevator in the new HONDA assembly plant in Guanajuato, Mexico.

Maintenance Technician

Harada Industries México
09.2012 - 02.2013
  • Corrective and preventive maintenance to Schleuniger cutting and stripping machines to maintain optimal operation.
  • PLC programming for engineering changes in assembly board machinery.
  • Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
  • Performed electrical and mechanical repairs of production equipment to minimize downtime.
  • Troubleshot equipment breakdowns and performed preventive maintenance.

Education

Mechatronics Engineering - Automation Area

Universidad Tecnológica De San Juan Del Río
San Juan Del Río, Querétaro, Mexico
05.2010 - 01.2014

Technical - Electromechanical Technician

CBTis No. 145
01.2007 - 01.2010

Skills

  • Electronic circuit design
  • Teamwork
  • Work under pressure
  • Work for objectives
  • Analysis of electrical diagrams
  • Maintenance management
  • Core tools
  • KPI´s
  • Process design and improvement
  • Proactivity

Languages And Software

  • Intermediate English B1 written and spoken (improving level in courses)
  • Microsoft Office
  • Autocad 2015
  • Solid Works & Solid Works electrical
  • Allen Bradley Micrologix software PLC
  • HMI, Step 7 Simatic manager// TIA portal 13-16
  • SAP software production management, control of spare parts and consumables, maintenance management

Personal Information

Date of Birth: 08/14/92

Timeline

Automation Engineer

GG Cables and Wires México
01.2018 - Current

Maintenance Leader

GG Cables and Wires México
09.2014 - 01.2018

Electrical Controls Technician

TecnoRampa S.A De C.V.
03.2013 - 09.2014

Maintenance Technician

Harada Industries México
09.2012 - 02.2013

Mechatronics Engineering - Automation Area

Universidad Tecnológica De San Juan Del Río
05.2010 - 01.2014

Technical - Electromechanical Technician

CBTis No. 145
01.2007 - 01.2010
Carlos Eduardo Montelongo PérezMechatronics engineer