February 2022 to March 2023, Bimbo Toluca.
Reconversion of a 13,000lb line of white bread to a shell bread line, a new product.
- Recover of a white bread line, making modifications and recovering disuse machinery like accupan, mixer, and blender. Purchasing some others like a volumetric dough divider and baggers.
- Purchase, installation, and start-up of new machinery, such as a volumetric dough divider, baggers, shell punch, and celorios.
June 2022 to September 2022, Bimbo Toluca.
Cold room for raw materials.
- Installation of 4C cold room for increase in raw materials due to installation of new LAR bakery line.
- Calculation, bidding, requisition, and installation of equipment and services required for its proper functioning, start-up, according to operational needs.
June 2022 to November 2022, Suandy Mexico.
Chocolate bulk system.
- Sending system of chocolate for the principe cookie capper in G7.
- Development with OEMs as calculation of the storage tanks, pumps, electrical cabinets, jacketed piping, and electrical hot water system.
June 2022 to December 2022, Suandy Mexico.
Cookie capper.
- Development with OEM to make an increment of production rate in the line of principe cookies.
- Purchase of cookie capper and cream system.
March 2023 - December 2023, Bimbo Mexicali.
Replacement of Mixer.
- Supervision, installation, and start-up of a refrigerated arm mixer to improve the quality of bun products on an active production line.
March 2023 - April 2024, Bimbo Mexicali.
Cold glycol system.
- Purchase, installation, and start-up of the pipe system and propane chillers.
- Sizing the future thermal needs of the factory since replacement due to obsolescence of the old mixers.
- Starting to update the new technology of eco-friendly refrigerants in Bimbo Mexico.
March 2023 - April 2024, Bimbo Mexicali.
Increase of rate of all the line.
- Sizing, bidding, requisition of machinery necessary to increase the line rate
- Production line movement in dough forming system to create enough space to be able to enter machinery required for the increase rate
- Improvement in product quality through a marking system for shell bread
- Improving previous decoration processes by updating control systems
January 2023 - Current, Bimbo Mexicali.
Bulk Sugar system,
- Sizing, tendering of assets, supervision and installation of circuits to improve the management of factory raw materials.
- Silos of 80 and 100 tons for supply to hoppers and internal silos of both plants
January 2023 - Current, Bimbo Mexicali
Improvement in the efficiency of flour.
- Optimizing the sending of raw materials to hoppers within the plant, enabling disused equipment, changing manual big bags systems in a bulk system using silos.
- Purchase a new silo of 60 Tons to automate the system of cake lines.
January 2023 - Current, Bimbo Mexicali
New line of buns, 1,300 pcs.
- Design, tender of machinery
- Execution planning for new line installation using PM tools such as MS project and kanban
- Tender, requisition and calculations of services
- Execution of a new 1,300 bakery buns line project which plans to cover future demand in the northwest area and export channel