Summary
Overview
Work History
Education
Skills
Timeline
Generic
Erick Chavarria

Erick Chavarria

Project Engineer Manager
Omo 9940 RVV, Chihuahua

Summary

Dynamic Project Engineer Manager with a proven track record at Puertas JJTA, achieving a 92.15% reduction in maintenance downtime. Skilled in CNC programming and technical data analysis, I excel in process design and production KPI tracking, driving efficiency and innovation in manufacturing environments. Strong leadership and coordination abilities enhance team performance.

Professional with broad expertise in engineering management, equipped to drive project success and innovation. Adept in coordinating multidisciplinary teams, ensuring timely and quality deliverables, and managing complex project timelines. Known for flexible problem-solving, effective communication, and fostering results-driven culture. Skilled in project planning, risk assessment, and resource allocation, with strong focus on collaboration and adaptability.

Overview

8
8
years of professional experience
1
1
Language

Work History

Project Engineer Manager

Puertas JJTA
09.2024 - 08.2025

Maintenance downtime reduction from 102 hours to 8 hours — 92.15% reduction

CNC programming — 40%

Fewer CNC programming errors in release to production

Development of new products
Sandblasting, metalwork laser and waterjet cutting, different use of wood materials, consistencies and applications

Building

Opening and closing access control — 0 incidents reported

Coordination production goals

Equipment (machinery) and tools for production
Installation of trim line
Installation of Sawstop
Purchase of portable production equipment and tools
Purchase of CNC equipment and tools

Training and Certification Specialist (Production)

Puertas JJTA
09.2022 - 09.2023
  • 27% reduction in rework hours Reduction from 450 hours to 135 hours (2022 - 2023)
  • Wood grading system to maximize productive yield and reduce unnecessary purchases Reduction from 450 hours to 135 hours (2023 - 2024)
  • 26% material recovered (new use) after processing the entire material for projects (2024 - 2025)

Production Manager

Puertas JJTA
09.2020 - 09.2022

57% increase in product output volume

Manufacturing Engineer

Puertas JJTA
08.2017 - 09.2020
  • 40% increase in work instruction output (2017 - 2018)
  • 30% increase in product output (2018 - 2019)
  • Installation of 2 production lines (electrical layout, space and movement planning, work teams, and installed capacity) (2018 - 2019)
  • Installation of equipment for alternate sizing process (movements, time, ergonomics) (2018 - 2019)
  • 4-hour time reduction to increase product output (2020)

Education

Bachelor's Degree in Engineering - Industrial Engineering

Universidad La Salle Chihuahua
Chihuahua City, Mexico
05.2001 -

Skills

Blueprint interpretation

Technical data analysis

Process design

Technical documentation (BOMs, SOPs)

ERP/MES systems implementation

Preventive and corrective maintenance planning

Coordination with production for scheduled downtimes

Machinery installation

Production KPI tracking

Timeline

Project Engineer Manager

Puertas JJTA
09.2024 - 08.2025

Training and Certification Specialist (Production)

Puertas JJTA
09.2022 - 09.2023

Production Manager

Puertas JJTA
09.2020 - 09.2022

Manufacturing Engineer

Puertas JJTA
08.2017 - 09.2020

Bachelor's Degree in Engineering - Industrial Engineering

Universidad La Salle Chihuahua
05.2001 -
Erick ChavarriaProject Engineer Manager