Summary
Overview
Work History
Education
Skills
Websites
MAIN IMPLEMENTED PROGRAMS
Accomplishments
Software
Work Availability
Work Preference
Languages
Timeline
d4
H. ADRIAN RIVERA ROCHA

H. ADRIAN RIVERA ROCHA

PROGRAM MANAGER
Saltillo

Summary

Project Manager with over 14 years of experience in the manufacturing industry. Extensive expertise in new product launches, process design, facility and equipment purchasing, facility design and development, implementation, and industrial engineering. Skilled in layout design, dock calculations, PFEP (Plan for Every Part), material flow optimization, warehouse design, workstation design, and new process development. Proven experience in the design and implementation of new automotive plants, including vehicle electrification, engine plants, stamping, painting, and battery production lines. Strong knowledge of WCM (World Class Manufacturing), SPW, and continuous improvement methodologies. Leadership experience managing teams of 20+ engineers and overseeing supplier management. Successfully delivered more than 25 major projects, including new vehicle and engine model launches.

Overview

15
15
years of professional experience
2
2
Languages

Work History

PROGRAM MANAGER

STELLANTIS – DSM (Saltillo Truck Assembly Plant)
06.2017 - Current
  • Led greenfield project for the launch of a new automotive plant
  • Directed electrification projects including the RAM truck and a new battery production line, stamping new press and paint shop.
  • Managed end-to-end projects for seat assembly.
  • Oversaw cross-functional teams to ensure successful delivery of project objectives.
  • Controlled and optimized project resources, ensuring alignment with strategic goals.
  • Applied industry standards to guide and standardize project execution.
  • Managed full project lifecycle: cost, scope, timing, quality, and risk.
  • Supervised material flow and PFEP, facilities, equipment, and racking systems.
  • Developed and validated layouts through 2D design, 3D simulation, indirect labor planning, and evaluation of new programs.

PROJECT LEAD INTER-PLANTS

FCA - DSM
04.2015 - 06.2017
  • Involves all activities listed in the past position but in Several plants:
  • Saltillo Truck Assembly Plant
  • Saltillo Van Assembly Plant
  • Saltillo South Engine Plant
  • Support Toluca Assembly Plant

PROJECT LEAD

FCA Saltillo Truck Assembly Plant - DSM
01.2013 - 04.2015
  • Main activities consisted in analyzing, developing, proposing and leading the implementation and launch of projects. (Metering Center, Stamping, BIW, painting and general Assembly).
  • Generate Material Flow Project Plan
  • Enforce deliverables
  • Communicate and control deviations from plan
  • Internal training
  • Develop and Manage Project Funding for Major Launches
  • Oversee execution of all facilities and equipment, containerization
  • Issue identification and resolution (Build issues/layout/packaging)
  • Tracks KPI and KAI status to target for assigned area
  • Design/Manage build of material display equipment
  • Prepare Bid-Spec’s
  • Manage facilities and equipment installation
  • Coordinate launch readiness with 3rd party, Tier One SPD and Modular suppliers
  • Coordinate and implement material call-off and alert system
  • Coordinate and implement warehouse/material control systems
  • Manage design of kit carts/special dollies/LCAs

PROJECT ENGINEER

FCA Saltillo Truck Assembly - DSM
12.2011 - 01.2013
  • Material Flow
  • PFEP to Flow Database conversion
  • Material Flow design (Dock- station)
  • Dock and float analysis
  • Storage and picking cells designs
  • Mobile equipment analysis (tuggers, fork truck, Harlan, etc.)
  • Detailed reports
  • Conceptual layout
  • Facilities and equipment (Material Handling)
  • Budget justification, quotes and bids with suppliers, creation and tracking of requisitions in SAP.
  • Supplier visits and . Coordinate suppliers that build facilities reviewing project from design to start up.
  • Facilities design validation, delivery to plant, try outs in line with all involved departments and launch
  • Rack and container analysis

Material Handling Intern

FCA Saltillo Truck Assembly Plant
09.2011 - 12.2011
  • Developing, proposing and implementing of logistics projects.
  • Date Base system update and production support

Material Handling Intern

Magna Closures
02.2011 - 06.2011
  • Ergonomics school Project involving all kinds of ergonomic studies, identify ergonomic hazards and suggest and implement improvements.

Education

Master of Business Administration -

Universidad Autónoma Del Noreste
09.2015

Bachelor Degree - Industrial and Systems Engineering

11.2011

Technical Degree - Administration and accounting assistant

Gabino García
08.2005

Skills

Project Management

MAIN IMPLEMENTED PROGRAMS

  • Program Manager.
  • RAM LD Greenfield new plant
  • RAM Truck HD Electrification
  • New RAM paint shop for Boxes
  • MCA RAM Truck HD MY2025
  • New RAM STAMPING Shop
  • RAM Truck HD/LD MY2023
  • RAM Truck HD/LD MY2022
  • VF Engine MY2022
  • RAM Truck HD/LD MY2021
  • WL 3.6 Engine MY2021
  • RAM Truck HD/LD MY2020
  • Project Lead.
  • RAM Truck HD/LD MY2019
  • RAM Truck HD/LD MY2018
  • RAM Truck HD/LD MY2017
  • PSU Engine MY2017
  • RAM Truck HD/LD MY2016
  • PSU Engine MY2016
  • RAM Truck HD/LD MY2015
  • Project Engineer:
  • RAM Truck HD/LD MY2014
  • RAM Truck HD/LD MY2013
  • RAM Truck HD/LD MY2012
  • Support:
  • FCA Insource Metering 2019
  • Van Truck VF MY2016-2018
  • Jeep Compass MY2017
  • Jeep Renegade MY2015

Accomplishments

    International Experience. Being part of the Project planning team for the new Jeep plant for Fiat-Chrysler in Brazil. Lead and create EBOM, planning of distribution for logistics management areas inside the facility, kit proposals, and activities related to material management in order to create a WCM model plant for FCA group. (Detroit MI, Nov 2014 – Jan 2015)

Software

AutoCad 2D

Excel

JT2GO

Power Point

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Work Preference

Work Type

Full Time

Work Location

On-SiteRemoteHybrid

Important To Me

Work-life balanceCareer advancement

Languages

English
Upper intermediate (B2)
Spanish
Bilingual or Proficient (C2)

Timeline

PROGRAM MANAGER

STELLANTIS – DSM (Saltillo Truck Assembly Plant)
06.2017 - Current

PROJECT LEAD INTER-PLANTS

FCA - DSM
04.2015 - 06.2017

PROJECT LEAD

FCA Saltillo Truck Assembly Plant - DSM
01.2013 - 04.2015

PROJECT ENGINEER

FCA Saltillo Truck Assembly - DSM
12.2011 - 01.2013

Material Handling Intern

FCA Saltillo Truck Assembly Plant
09.2011 - 12.2011

Material Handling Intern

Magna Closures
02.2011 - 06.2011

Technical Degree - Administration and accounting assistant

Gabino García

Master of Business Administration -

Universidad Autónoma Del Noreste

Bachelor Degree - Industrial and Systems Engineering

H. ADRIAN RIVERA ROCHAPROGRAM MANAGER