Summary
Overview
Work History
Education
Skills
Software
Timeline
Generic

Hector Castillo

Industrial Engineer
Apodaca

Summary

Industrial Engineer with 15 years of experience in optimizing manufacturing processes, improving operational efficiency, and leading cross-functional teams. Expertise in lean manufacturing, Six Sigma methodologies, and process improvement. Adept at implementing cost-saving strategies while maintaining high quality and safety standards. Passionate about innovation, automation, and continuous improvement to drive productivity and profitability.

Overview

17
17
years of professional experience
1
1
Language

Work History

Production Manager

KKSP
02.2025 - Current
  • Plan, coordinate, and manage daily machining operations to meet production targets and quality standards.
  • Develop and implement efficient manufacturing processes and optimize machine utilization.
  • Monitor key performance indicators (KPIs) to ensure efficiency, cost-effectiveness, and compliance with production schedules.
  • Lead, train, and mentor machining team members, fostering a culture of teamwork and continuous improvement.
  • Ensure all safety procedures and company policies are followed to maintain a safe working environment.
  • Collaborate with engineering, quality, and maintenance teams to improve production efficiency and resolve technical issues.
  • Manage inventory levels of raw materials and tooling to support uninterrupted production.
  • Implement lean manufacturing principles and continuous improvement initiatives to enhance productivity.
  • Troubleshoot machining problems, reduce downtime, and drive process improvements.
  • Prepare reports on production performance, efficiency, and workforce utilization.

Industrial Engineering Manager

Celestica
04.2022 - 02.2025
  • Responsible for understanding the customer's technical roadmap and identifying and managing all new customer-specific process development projects.
  • Manage technical aspects for all new customer-specific process development projects.
  • Develop the scope of all technical work, coordinate the team, direct work assignments, and assist with problem resolution for the full customer product life cycle support for all manufacturing technical issues related to the customers' product(s) from product conception to product obsolescence.
  • Evaluate potential manufacturing impact for each design concept.
  • Responsible for the best practice standard development, participate in industry organizations for developing the standards, and provide training and application support globally.
  • Set yearly plans and goals for the department, give direction on expected performance, and provide regular performance evaluations and ongoing feedback.
  • Accountable for all department objectives and achieving agreed targets for key performance indicators.
  • Perform layout designs and redesigns at both micro and macro levels.
  • Ensure governance, control, and management of capacity studies.
  • Govern, control, and adhere to 3P radar as the main KPI of Industrial Engineering.
  • Generate and manage the product playbook.
  • Maintain up-to-date cycle time information.
  • Identify and implement labor efficiencies.
  • Coordinate line and area releases.
  • Manage and master PMOs for layout movement coordination.
  • Maintain fully completed procedures for layout movements.
  • Participate in the introduction of new projects and new processes.
  • Engage in Kaizen projects and process improvement action closures.
  • Participate in flowchart mapping and flow analysis.
  • Contribute to the design of safe work areas.

SR. Industrial Engineer

Methode
11.2020 - 04.2022
  • Engineering Department Coordination
  • Capacity Planning Management for Automotive Business Units CAR's (Ford, GM, Tesla, Volvo, Rivian, Polaris)
  • VAVE Projects Coordination for Ambient Light BU 550K USD of Savings (2020-2021)
  • Headcount Playbook Management
  • Process flow connection between Make Parts Areas and Assembly Lines
  • Support introduction of new products & R@R Layout Management

SR CI Engineer

Rexnord
11.2015 - 11.2020

• CI Department Coordination

• Manufacturing System Implementation to Move 3 Business Units from USA To

• Mexico (Lay Out, Flow Material, Capacity Studies, Work Balance)

• Capacity & Headcount Playbook Management

• Continuous Improvement Strategies, Road Maps & Kaizen Events Calendar

• Dashboards Implementation for updating and monitoring of KPI's

• Continuous Flow Implementation for Main Value Stream to improve Lead Time from 15 - 5 days

• Problem Solving Projects using the Shainin Red X Methodology

• Layout Management & Sqft optimization

• VAVE Projects Coordination

Industrial Engineer

Whirlpool
04.2012 - 11.2015

• Manufacturing System Implementation for launching 2 New Assy Lines (Layout, Flow Material, Capacity Studies / Takt Time scenarios calculation, Work Balance, Headcount Calculation, Work Instructions, & SWS).

• Manufacturing System Implementation to Move 1 Copper Tube Area from CD. Juarez to Apodaca.

• Capacity & Headcount Playbook Management for 2 Buildings.

• Cost Reduction Projects 130K USD Savings. (HC reduction & Offal project in presses).

• Support for continuous flow production lines, press and painting processes.

• Process flow connection between Make Parts Areas and Assembly Lines

Industrial Engineer

Methode
11.2010 - 04.2012

• Headcount Calculation for New Assemble Cells.

• R@R Support

• TPS Trainings

• Standard Work Implementation • Hour by hour boards implementation.

• Layout Management

Process Engineer

Caterpillar
06.2008 - 11.2010

• Standard Work Implementation

• Andon System implementation

• CPS Training Operators

• Production Line Support to increase efficiency and productivity

• VA/NVA Analysis for projects to reduce downtime.

Education

Industrial Engineer - Engineering

Insituto Tecnologico De CD Madero
Ciudad Madero, Tamaulipas, Mexico
05.2001 -

Skills

    Project management

    Production line management

    Capacity planning

    Continuous improvements

    Lean manufacturing

Software

Auto CAD

Timeline

Production Manager

KKSP
02.2025 - Current

Industrial Engineering Manager

Celestica
04.2022 - 02.2025

SR. Industrial Engineer

Methode
11.2020 - 04.2022

SR CI Engineer

Rexnord
11.2015 - 11.2020

Industrial Engineer

Whirlpool
04.2012 - 11.2015

Industrial Engineer

Methode
11.2010 - 04.2012

Process Engineer

Caterpillar
06.2008 - 11.2010

Industrial Engineer - Engineering

Insituto Tecnologico De CD Madero
05.2001 -
Hector CastilloIndustrial Engineer