Optimization of project evaluation and feasibility analysis processes:
- Received and evaluated project proposals from potential clients, managed initial contact and follow-ups, and optimized supplier communication channels to enhance supply chain efficiency.
- Optimized evaluation processes for feasibility analysis and personalized client advisory services.
- Implemented best practices for feasibility analysis, improving response time efficiency by 60% and minimizing project delays.
Constellation Brands – Research and Product Development:
- The client needed a more efficient and cost-effective alternative to aluminum sulfate for phosphorus reduction in industrial wastewater, aiming to optimize treatment performance while minimizing operational costs.
- Led pilot testing of the MAP-CLC 35/65 coagulant at the Nava plant, implementing a rigorous monitoring system and coordinating cross-functional teams to analyze key variables.
- Achieved a 66.67% reduction in sludge production, lowering disposal costs and extending the supply interval from 3 to 12 days, optimizing both cost and logistics.
Constellation Brands – Process Water Treatment Optimization Project:
- Led an operational optimization project for Constellation Brands' Nava Plant, analyzing performance data to drive informed decisions.
- Replaced 30 existing reverse osmosis filtration membranes with new technologies, improving operational efficiency by 10%.
- The project was approved by Constellation Brands executives, representing $20,000 USD in savings. Efficiency and optimization objectives were successfully met.