MS Office
Talented professional considered knowledgeable leader and dedicated problem and skilled solver. Brings 20+ years of valuable expertise to forward company objectives.
Attentive to detail with experience in coordinating projects, programs and improvements. Skilled at identifying or anticipating problems and providing solutions.
Proactive and goal-oriented with excellent time management, strong analytical, communication, and teamwork skills, with proven ability to quickly adapt to new environments.
Eager to contribute to team success and further develop professional skills. Brings positive attitude and commitment to continuous learning and growth. Excels through mentoring, training and empowering team to excel in performance.
Known for reliability and adaptability, with swift capacity to learn and apply new skills.
Committed to leveraging these qualities to drive team success and contribute to organizational growth.
Consultant. Technical Support Service for the EPC Project Installation of the P2-C02C Compressor and the P2-H01/2/3 Cabin Furnace. Catalytic Reforming Unit (CCR) at the Esmeraldas State Refinery of EP Petroecuador by the DITEMAQ Consortium. Esmeraldas, Ecuador. Contract Amount: USD 49,963,000
Production Engineering Projects of Toyota Motor Engineering & Manufacturing North America (TMNA) in its Guanajuato Plant (TMMGT) - Final Assembly Shop for the introduction of the new 2024 Tacoma model.
Management of beef production process projects in TIF plants of Durango, Michoacán, and Monterrey.
EPC Project of the 4th Production Line of Base Polyols (Engineering Phase).
Construction of 21 onshore modules belonging to Area 3 of the construction yard, located on the south side of the Panuco River for Pennsylvania Chemicals - Shell Ethylene Cracker Plant, a chemical plant under construction in Potter Township, Pennsylvania, near Pittsburgh, USA, that will be owned and operated by Shell Oil Company, the American subsidiary of the supermajor oil company Royal Dutch Shell. Under BECHTEL's supervision.
Construction and installation of piping and mechanical equipment systems for utilities (chilled water, compressed air, natural gas, gray water, and domestic cool water) for the GM Ramos Arizpe Engine Plant CSS2 Project at the Ramos Arizpe GM Complex. Including detailed engineering, procurement, construction, and start-up support. Under WALBRIDGE's supervision.
Contract amount of USD 5,151,617.17.
EPC Project: Limestone Crushing Plant, 1200 TPH in Tula Plant of Fortaleza Cements. Contract Amount: USD 11,000,000.
EPC, start-up, and commissioning project of the relief and venting system for the gas compression plant Jusepin 200, with a nominal capacity of 200 MMSCFD of gas from 60 psig to 1300 psig, associated with the production of El Furrial field wells for PDVSA GAS, S.A. Contract Amount: USD 35,008,434.
Main Station Upgrade Construction Project to increase the capacity of treatment of heavy oil by 95 KBPSD for PETROCEDEÑO, S.A. Contract Amount: USD 123,325,165.
The EPsCm El Palito Refinery Expansion Project (Engineering Phase) aims to increase refining capacity from 140 to 280 KBPSD, executed by the consortium formed by the companies TOYO Engineering Corporation, Foster Wheeler Italian, and Y&V for PDVSA, S.A. Contract amount: USD 92,171,226.
New Fertilizer Plant EPC Project by the consortium formed by the companies TOYO Engineering Corporation, Ferrostaal GmbH, and Y&V for PEQUIVEN, S.A. Contract Amount: USD 1,200,000,000.
Coaching and mentoring
MS Office
MS Project
MS Visio
AutoCAD
BIM
REVIT
DocuSign
Lifting Supervisor, Crane´s Engineering & Operator - Dec. 2019-Dec. 2020
English Certificate - B2 Upper Intermediate, EF Set - Jun 27, 2025
Lifting Supervisor, Crane´s Engineering & Operator - Dec. 2019-Dec. 2020