Electrical Foreman Supervisor/ Journeyman 11 of experience in new and major industrial projects. Excellence in juggling multiple tasks and working with other electricians . Strong Leadership and project management abilities. Excellent in leading people to work safe with good productivity as well to complete work task on time with good quality for the customer. Always focus in work task to be come better want to keep growing in this craft and industries.
Working installing 480v panels and 3 phase trasformers for required systems two months later was promoted to Forman position was in charge of installing Duck Banks system with a crew of 8 people installing pvc underground, installing conduict on pads where transformers and panels was going to be place , running bare ground, intalling
10ft gd Rod, Cadwelds being done, pull cable, install channel tray install transformes, panels, terminate cables in panels as well in transformers verify for proper voltage troubleshooting electrical systems.
Terminations in Instrumentations panels as well field instruments and Junction electrical boxes. Had to trouble shoot after complete panel wiring according to drawing specifications. Terminations heat trace panels power cables. Would walk systems with cables schedule by date to be completed 100%. Walk to others verify their terminations were done right according to landing points.
In charge of Heat Trace Installation, Install instruments on pipes or tubing , place heat trace cable with fiber type according to the Drawing specifications, meg cable as well as termination in main Panel power source and trouble shooting system before sale it . Would verify that others people work and walk systems down.
I was in charge of all Heat Trace and Conduict as Well to be install in the train 6 in Sabine pass with Bechtel was able to read all drawing or layouts to see where all specific instruments and Conduicts ended or had a drop to catch all instruments in a run had my crew focus at all times always had different plans to keep them busy and working save.
Was in charge of all heat tracing system, installing instruments,
Installing cables on their belong ISO’s as well termination of cables in the junctions boxes. Had a group of people working in my crew that’s perform all this tasks.
My responsibilities was to work on all electrical equipment , terminations on Motors, junction boxes cables. Run wire on Cable trays or conduct tubing. Install instruments on stands around the unit, run and install the conduit for this instruments and at the end the wire in the instruments. Works on Lighting installation and terminations points. Work on high voltage transformers phase to phase connections. Phone out wires and use the megger to verify the Insulation Testing . Grounding cable trays, junction boxes, and structure using proper tools.
My job was to lead a group of people to perform a good job task and to be productive. Myself have to organize and coordinate work and make sure all crew members work safe and be productive during the day. Verify that the job was getting done in a good way and as follow on the prints and following the correct route. I Had to Wire in empty units with all sizes of wire, and all different cables to run through cable trays and conduits for motors, transformers, instruments, control wires, as well as lighting wires to turn on all equipment in the unit verify was the correct size and wire for each individual equipment and length also . Be able to deal with people as well other contracts in the area and to always have the proper paper work to begin each day task. Be able to read and understand drawing title block prints ans and blue prints.
Install Electrical Boxes, modified and move instruments from one place to another, deal with various types of cables ways. Had to run conduit from instruments to junction box , Measuring and cutting cable trays and installing . Demonstrated expertise in the use of cable reels , stripping tools, voltage detectors. Using the megger wires out before being landed in the equipment.
Running cable tray, pulling wire install cable tubing, operated different tools. Terminating wires in the equipment use for crimping tools and wire cutters. Figure out routes to be install to place conduit and cable pulls, deal with breakers and other components.
State of Texas, Appre Certification License
Licence Number : 309672
Electrician Facts and Working On Hands
INDUSTRIAL ELECTRICIAN V6 NCCER
#11694657