Summary
Overview
Work History
Education
Skills
Additional Information
Languages
Training
Certification
Timeline
Industrial Engineer

Luis Fernando Garcia Ortiz

PIMS Mitsubishi
Mexicali
Luis Fernando Garcia Ortiz
7
years of professional experience
1
Certification

Knowledgeable Industrial Engineer skilled in process improvements, equipment design and waste reduction. Strategic planner and analytical problem solver. History of improving production and maximizing efficiency.

Work History

Industrial Engineer

5 Years
PIMS Mitsubishi | 11.2021 - Current
  • Continuous improvement
  • Provide analytical information to documents, such as proposals or other operating procedures for production improvement
  • SMED (Single Minute Exchange of Die)
  • Capacity analysis (Cp and CPK) for the control of length measurements
  • Capability Analysis and Pareto Analysis, as well as in the use of DMAIC and SIPOC concepts
  • Responsible for the implementation of improvement projects continuous, 5S, error proofing, reduction of set ups, total productive maintenance, troubleshooting and lean tools, kaizen events
  • Improvement developed: Introduced a new production machine CNC Bender Machine (Japanese machine) for the manufacture of copper pipes.

Process Engineer Jr.

4 Years 5 Months
Papel San Francisco | 06.2017 - 11.2021
  • Implement Quality control activities or procedures to solve production problems
  • Provide analytical information to documents, such as proposals or other operating procedures for production improvement
  • Perform time and movement analysis
  • SMED (Single Minute Exchange of Die)
  • Reduction in waste or raw materials
  • Equipment inspection control
  • Implement test for the introduction of new products
  • Parameterizations standar
  • Conduct research to evaluate a possible solution to design changes in equipment
  • Tool audit (check list) to verify that they have their tools for their work area
  • Communication with suppliers, for the purchase of materials (review of quotes)
  • Improvement developed: Project to save blades in the hygienic cutter equipment, having a profit 1,000,000 pesos per year
  • (DMAIC Methodology)
  • Increase in productivity of 20% in a kitchen towel product, having a profit of 2,000,000 pesos per year
  • (DMAIC Methodology).

Education

Master - Innovation And Engineer(Quality & Manufacturing)

Centro De Enseñanza Técnica Y Superior (CETYS) | 12.2025

Carrer - Industrial Engineer (Logistics and operations)

Centro De Enseñanza Técnica Y Superior (CETYS) | 04.2018

Skills

Process Improvement
Strategic Planning
Manufacturing Processes
Project Management
Lean principles
Equipment Operation

Additional Information

As an organized and motivated person, I am able to adapt to any circumstance and always give my best in any continuous improvement project, while working as a team and promoting values.

Languages

English

Training

  • Six Sigma Green Belt (CETYS Universidad) 2022
  • Lean Manufacturing (Cetys Universidad) 2019
  • DMAIC Methodology
  • SMED (Single Minute Exchange of Die)
  • Continuous improvement

Certification

  • Certified Lean Manufacturing, CETYS Universidad - 2019

Timeline

Industrial Engineer

PIMS Mitsubishi
11.2021 - CurrentRead More

Process Engineer Jr.

Papel San Francisco
06.2017 - 11.2021Read More

Centro De Enseñanza Técnica Y Superior (CETYS)

Master from Innovation And Engineer(Quality & Manufacturing)
Read More

Centro De Enseñanza Técnica Y Superior (CETYS)

Carrer from Industrial Engineer (Logistics and operations)
Read More
Luis Fernando Garcia Ortiz