Knowledgeable Industrial Engineer skilled in process improvements, quality control, waste reduction and material planning. Strategic planner and analytical problem solver. History of improving production and maximizing efficiency.
Overview
18
18
years of professional experience
1
1
Certification
Work History
Manufacturing Quality Engineer
Lear Corporation
Piedras Negras, Coahuila, Mexico
12.2021 - Current
Enhanced product quality by implementing robust inspection procedures and process improvements.
Reduced manufacturing defects (PPM´s) by closely monitoring production processes and identifying areas for improvement.
Streamlined quality control processes through the development of efficient testing methods and protocols.
Collaborated with cross-functional teams to resolve manufacturing issues and ensure consistent product quality.
Improved customer satisfaction with timely resolution of product issues and thorough root cause analysis (8Ds)
Implemented statistical process control methodologies to monitor production trends, identify potential problems, and proactively address them before they escalate (SPC)
Led training initiatives for new team members, ensuring a strong understanding of quality assurance best practices.
Incoming Quality Supervisor
Hyundai Mobis
Monterrey, Nuevo León, Mexico
08.2015 - 11.2021
Enhanced product quality by implementing stringent inspection processes and providing comprehensive feedback to production teams.
Reduced customer complaints by addressing root causes of quality issues and driving continuous improvement initiatives.
Streamlined quality control procedures for increased efficiency and reduced production downtime.
Collaborated with cross-functional teams to establish quality standards and ensure compliance with industry regulations.
Administration of Quality Inspection process LP/CKD materials
Management of 1 Team Leader and 13 quality inspectors
Coordinated disposal of discrepant materials unsuitable for rework or recycling.
Tracked quality issues with external customers, suppliers, and internal plant operations.
Supervised and directed quality control personnel through effective mentoring, coaching and work delegation.
Manufacturing Engineer
Mabe - General Electric
Saltillo, Coahuila, Mexico
07.2012 - 08.2015
Improved process efficiency by implementing Lean Manufacturing principles and reducing waste.
Enhanced product quality by designing and executing rigorous testing protocols for all manufactured items.
Collaborated with cross-functional teams to develop innovative solutions for complex engineering challenges.
Increased production capacity with the optimization of equipment layout and workflow design.
Developed standard work procedures to ensure consistency in manufacturing processes and reduce variability.
Implemented 5S methodology to maintain an organized, clean, and safe work environment for all employees.
Facilitated Kaizen events to drive rapid process improvements across multiple departments within the organization.
Provided training on Lean Manufacturing concepts to team members, fostering a culture of continuous improvement.
Supported new product development efforts by providing input on manufacturability during design reviews.
Performed value stream mapping exercises to visualize current-state processes and develop future-state goals based on Lean Manufacturing best practices.
Analyzed manufacturing data to identify trends, potential bottlenecks, and areas for improvement in efficiency or quality metrics.
Designed ergonomic workstations, reducing employee strain and promoting long-term health benefits among the workforce.
Optimized material flow by reconfiguring storage locations within the facility, resulting in reduced lead times for finished goods delivery.
Introduced cellular manufacturing concepts to create efficient production lines tailored to specific product families or customer requirements.
Direct Material Planner
Delphi Diesel Systems
Saltillo, Coahuila, Mexico
01.2008 - 07.2012
Optimized inventory levels by implementing demand forecasting and material replenishment strategies based oni MRP.
Reduced lead times for critical materials by establishing strong relationships with suppliers and streamlining procurement processes.
Increased production efficiency by closely monitoring material availability and proactively addressing potential shortages.
Enhanced supply chain visibility with regular updates on material status, ensuring timely delivery of products to customers.
Consistently met or exceeded key performance metrics related to material planning accuracy, supplier performance, and inventory turns.
Facilitated collaboration between production, warehouse and technical personnel to meet procurement needs.
Inspected stocks to identify shortages, replenish supply and maintain consistent inventory.
Forecasted production schedules and adjusted plans to accommodate changes in demand.
Constantly contact with suppliers from France, UK, USA, Germany, and Turkey.
Collaborated with cross-functional teams to align production plans with customer requirements.
Shipment Supervisor
Caterpillar
Ramos Arizpe, Coahuila, Mexico
07.2006 - 01.2008
.
Reduced shipping errors by closely monitoring inventory and conducting regular audits.
Improved customer satisfaction with timely deliveries through effective route planning and coordination.
Negotiated favorable contracts with carriers, resulting in significant cost savings for the company.
Optimized loading procedures, reducing time spent on preparing shipments for transport.
Pulled, verified, and packaged items for shipment.
Prepared shipping documents and invoices, processed payments, and fielded client questions.
Communicated with vendor representatives to resolve damaged shipments and item shortages.
Coordinated driver dispatch to accomplish daily delivery requirements.
Collaborated with manufacturing and supply chain management.
Organized storage areas to optimize materials movements and minimize labor hours.
Practitioner
Adient
Saltillo, Coahuila, Mexico
01.2006 - 07.2006
Collected and organized data for use in key decision-making.
Collaborated with cross-functional teams to develop and implement process changes.
Assisted management in maintaining ISO certification through diligent documentation and adherence to established protocols.
Performed tests and inspections to conform to established standards.
Performed routine maintenance and calibration on testing equipment.
PPAP documentation support
Quality Engineers projects support
Skilled at working independently and collaboratively in a team environment.
Self-motivated, with a strong sense of personal responsibility.
Education
Bechelor Degree - Industrial Engineering & Manufacturing Process