Summary
Overview
Work History
Education
Skills
Websites
Certification
Languages
Timeline
Generic
Luis Ramón Mayagoitia Cerda

Luis Ramón Mayagoitia Cerda

Reynosa, Mexico City,CMX

Summary

Experienced and reliable Team Manager with successful history leading and motivating staff members to exceed goals. Offers excellent communication and organizational skills. Adept at resolving conflicts and addressing emerging issues.

Overview

5
5
years of professional experience
1
1
Certification

Work History

Especialista AW3000 Zona Norte MX

Acciona Energía
12.2022 - Current
  • Reliability in operational turbines through Qliwview, Sharp reports
  • Annual maintenance plan
  • Coordinate the supervision of preventive, corrective and predictive maintenance work, detecting failures.
    analyzing incidents and proposing improvement actions.
  • Preparation of monitoring reports and monthly presentations with the engineering department
  • Locate areas of improvement in coordination with the engineering department.
  • Coordinate support for solving significant and difficult-to-solve incidents handled by operators.
  • Skilled at working independently and collaboratively in a team environment.
  • Self-motivated, with a strong sense of personal responsibility.
  • Proven ability to learn quickly and adapt to new situations.
  • Worked well in a team setting, providing support and guidance.


Service Operations Manager

Siemens Gamesa
01.2020 - 12.2022
  • Wind Farm Piedra Larga 1 90 MW.
  • Converter Ingeteam_V3.3 INGECON_Siemens Gamesa G80 (2000KW).
  • Wind Farm Piedra Larga 2 138 MW.
  • Converter ACS 800 67_Siemens Gamesa G8X (Air-cooled 2000KW).
  • Analyzed service reports to identify areas of improvement.
  • Developed and maintained positive relationships with customers to build rapport and trust.

Site Supervisor

Siemens Gamesa
02.2019 - 12.2020
  • Wind Farm Stipa Nayaá 74 MW
  • Converter Ingeteam_V3.3 INGECON_Siemens Gamesa G80 (2000KW).
  • Wind Farm Zopiloapan 70 MW.
  • Converter Ingeteam_V3.3 INGECON_Siemens Gamesa G80 (2000KW).
  • Guarantee the optimal performance of the turbines for their generation and distribution to the electrical grid.
  • Management of human resources for the distribution of tasks and pending tasks.
  • Project administration.
  • Materials, logistics and equipment management.
  • Customer satisfaction with work and quality.
  • Cost reduction in operation and maintenance of wind turbines Energy efficiency.
  • Power curves based on the calculation generated by temperature and wind.
  • Planning corrective and preventive activities.
  • Labor management through subcontractors
  • Administration of resources assigned to the project to achieve profitability and meet demand.
  • Compliance with KPIs.
  • Objectives set by the company.
  • Review of High Risk corrective and preventive alarms.
  • Design improvements implemented in the G80, G90 and G114 machines
  • O&M Merit process personnel recruitment management.
  • Reports and monthly statistics reports for management and client.
  • Coordination of end of warranty and contractual closure of turnkey project.
  • Closing of temporary and energy contractual availability

Team Leader

SGRE Parque Eólico La Amistad 1
  • Converter DAC_Electric Convert Siemens Gamesa G132 (3465KW).
  • First stage start-up.
  • Stayed calm, collected and logical during stressful moments to identify and implement optimal solutions.
  • Owner Approval Certificate (CAP) first stage.
  • Gamesa G132 technical problem solution.
  • DAC-CCLINK Converter
  • Covertool
  • Troubleshooting with the help of the technology department.
  • Productive processes.
  • Efficient management of human resources.
  • Compliance with applicable safety and quality regulations.
  • Monitoring and closing of work orders.
  • Recruited and trained high-performing team members, maintaining optimized customer service.

Technical Lead

Parque Eólico Palo Alto
  • Convertidor ABB DTC ACS800 67 LC AW3000 (3000KW).
  • Change of generator bearings rotor side and stator side
  • Investigated system issues and implemented resolutions to reduce downtime.
  • Changing brake calipers yaw Brand Iruña and KRT
  • Major and Minor Preventive Maintenance
  • Gbox Moventas PPHL2000 videoscope inspection

Technician

Parque Eólico Dominica Fase 1 , Fase 2
  • Convertidor Ingeteam_V3.3 INGECON_Siemens Gamesa G97 (2000KW).
  • Performed troubleshooting and diagnosis on malfunctioning equipment.
  • Pitch hydraulic cylinder replacement
  • Design improvements
  • Generator and multiplier alignment using laser fixtur
  • Troubleshooting hydraulic system
  • OCS Troubleshooting
  • Major and Minor Preventive Maintenance

Education

Ingenierio Mecatronico - Numero De Cedula Profesional 11287904

Universidad Tangamanga
San Luis Potosí City, San Luis Potosí, Mexico
08.2016

Skills

  • Time Management
  • Resource Allocation
  • Team Leadership
  • Process Improvement
  • Customer Service
  • Staff Training
  • Problem Solving
  • Project Management
  • Data Analytics
  • Preventive Maintenance

Certification

  • Ingeteam Ingesys Converter Course.
  • ABB ACS-800-LC Course.
  • CTAI AT, MT BT Course.
  • Schneider maneuvering cell course.
  • Ormazabal maneuvering cell course.


Languages

English
Elementary (A2)

Timeline

Especialista AW3000 Zona Norte MX

Acciona Energía
12.2022 - Current

Service Operations Manager

Siemens Gamesa
01.2020 - 12.2022

Site Supervisor

Siemens Gamesa
02.2019 - 12.2020

Team Leader

SGRE Parque Eólico La Amistad 1

Technical Lead

Parque Eólico Palo Alto

Technician

Parque Eólico Dominica Fase 1 , Fase 2

Ingenierio Mecatronico - Numero De Cedula Profesional 11287904

Universidad Tangamanga
  • Ingeteam Ingesys Converter Course.
  • ABB ACS-800-LC Course.
  • CTAI AT, MT BT Course.
  • Schneider maneuvering cell course.
  • Ormazabal maneuvering cell course.


Luis Ramón Mayagoitia Cerda