Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Ramon Edgardo Grijalva Sandoval

Tecate

Summary

Hardworking and motivated professional with several years of experience and record of success in industry. Solid history balancing team performance, customer service targets and business objectives. Dedicated to working closely with employees to maximize productivity and optimize procedures. Decisive leader with good planning and organizational skills.

Overview

32
32
years of professional experience

Work History

CI / ME / Mfg. Manager (Outsource)

Earthlite LLC
Vista
01.2022 - 01.2026
  • Implemented Earthlite Operating System (China site): Stage 1.0 - Planning/Awareness/Preparedness for EOS implementation. Stage 2.0: Lean Daily Management System implementation. Stage 2.0: Lean Daily Management System implementation (LSW, Tiered (MDI) meetings, visual management an). Stage 3.0: Lean standardization tools (Standard work, 5S, visual management, TPM) and in parallel. Stage 3.5: Kaizen blitz events yearly scheduling/pipeline, costing and execution kick off.
  • Conducted QMS deployment (ISO2001:2015 compliance) in China site 75% progress. Planned to update current QMS system in 2026 once new ISO 2001:2026 revision is globally released.
  • Successful manufacturing operation transferring from Vista site to manufacturing subcontractors in Mexico representing annual saving for $100K.

Manufacturing and Quality Engineering Supervisor

Hobie Cat
Tijuana
06.2021 - 01.2022
  • Productivity improvement saving $100k through design of one-piece flow production kayak assembly lines.
  • Create basic QA-QMS documentation/processes such NPI, SOP, incoming inspection, In process inspection, Customer complaints, non-conforming materials disposition, etc.

Sr. Manufacturing Engineer

TE Connectivity
Tecate
12.2019 - 06.2021
  • Led/Facilitated 3 Kaizen events focused on Cycle time reduction, scrap reduction and vertical integration applying Lean Diagnose Strategy: Savings for $70K.
  • Merced transition project: 1500+ SKUs transferred from Oceanside site to Tecate site.

Sr. Continuous Improvement Engineer

Becton Dickinson
Tecate
01.2019 - 12.2019
  • Facilitated 6 Kaizen events focused on scrap reduction: Savings for $226K.
  • Facilitated 3 Kaizen events focused on SMED implementation: Equipment availability increased 4%.
  • Led pouch sealing optimization project: Increase 20% productivity and 15% footprint optimization: Project Phase I: Savings for $120K.

Product Design Engineering Supervisor

Honeywell
Tijuana
08.2017 - 06.2018
  • Component Engineering/Value Engineering: Drive engineering team to achieve savings for $200K.
  • Financials: Conduct engineering team in the execution of all engineering changes for relevant products to ensure continuous production and compliance with product regulations.
  • Cycle time: Engineering team has achieved efficiency improvements by focusing on O&M project management through JIRA and SAP/PDM deployment and improvement.

Sr. Product Design Engineer

Honeywell
Tijuana
06.2011 - 08.2017
  • Component Engineering/Value Engineering saving projects: 2012: $30K. 2013: $45K. 2014: $40K. 2015: $30K, 2016: $45K, 2017: $90K.
  • Respiratory protection, hearing protection and fall protection LoB Engineering Change Request system administration ownership.
  • CI (JDI) savings: ~10K.
  • SAP/PDM engineering change system administration; North Safety/Sperian legacy APR product family engineering changes follow up and engineering documentation update.

Sr. Manufacturing Engineer

Honeywell
Tijuana
11.2008 - 06.2011
  • ISC saving; Productivity: $150K. Inventory: $600K.
  • NPI projects: 60 plus SKUs.

Sr. Manufacturing Engineer

Westmed Inc.
Tecate
01.2007 - 11.2008
  • Cycle time reduction saving projects: Productivity: $150K. Scrap: $50K.
  • NPI projects: 20 plus respiratory circuits. 30 plus Respiratory cannulas.
  • Responsible for IQ, PQ and EQ on respiratory circuits and cannulas manufacturing LoB.

Manufacturing Engineering / Quality Assurance / Maintenance supervisor

Magnotek Manufacturing Inc.
Tecate
03.2003 - 01.2007
  • Cycle time reduction saving projects: Productivity: $300K. Scrap: $100K.
  • NPI projects: 150 SKUs.
  • Leading: 3 Manufacturing engineers, 4 QA inspectors and 2 Maintenance technicians.

Importadora Baja

Owned by Ramon Grijalva
Tecate
02.2001 - 03.2003
  • Import of any kind of light vehicle such a sedans, pick up trucks, SUV, vans. 15 - 20 vehicles imported on weekly basis

Sr. Manufacturing Engineer

Leviton
Tecate
06.1998 - 01.2001
  • Cycle time reduction saving projects: Productivity: $150K.
  • NPI projects: 50 plus SKUs.

General Manufacturing Supervisor

Rines Nacionales
Tecate
05.1994 - 06.1998
  • Manufacturing area administration: 3 product families (Aluminum wheels, steel wheels and aluminum/steel wheels).
  • Managing a manpower of around 150 employees.

Education

Industrial Engineering -

Universidad Autónoma de Baja California

Skills

  • Honeywell lean practitioner
  • Becton Dickinson lean practitioner
  • Honeywell Six sigma core green belt
  • Soft skills
  • Emotional intelligence
  • Supervision leadership
  • SolidWorks essentials
  • ISO9001 internal auditor
  • AS9100 internal auditor
  • Autocad

Languages

English
Advanced
C1

Timeline

CI / ME / Mfg. Manager (Outsource)

Earthlite LLC
01.2022 - 01.2026

Manufacturing and Quality Engineering Supervisor

Hobie Cat
06.2021 - 01.2022

Sr. Manufacturing Engineer

TE Connectivity
12.2019 - 06.2021

Sr. Continuous Improvement Engineer

Becton Dickinson
01.2019 - 12.2019

Product Design Engineering Supervisor

Honeywell
08.2017 - 06.2018

Sr. Product Design Engineer

Honeywell
06.2011 - 08.2017

Sr. Manufacturing Engineer

Honeywell
11.2008 - 06.2011

Sr. Manufacturing Engineer

Westmed Inc.
01.2007 - 11.2008

Manufacturing Engineering / Quality Assurance / Maintenance supervisor

Magnotek Manufacturing Inc.
03.2003 - 01.2007

Importadora Baja

Owned by Ramon Grijalva
02.2001 - 03.2003

Sr. Manufacturing Engineer

Leviton
06.1998 - 01.2001

General Manufacturing Supervisor

Rines Nacionales
05.1994 - 06.1998

Industrial Engineering -

Universidad Autónoma de Baja California
Ramon Edgardo Grijalva Sandoval