Obtain a position as a program manager to bring programs from concept into production. While at the same time implementing improvement on the process where I see fit by using my previous expertise in the subject.
Overview
16
16
years of professional experience
Work History
Program Manager
Ted de México, S.A. de C.V.
12.2020 - Current
Oversee the implementation of new products, process improvements and capacity demonstration successfully, following SPLP/APQP guidelines
Manage the relationship with the customers to understand their needs and wants, while leading a multidisciplinary team to ensure the delivered product met the customers’ expectations
Management and coordination of budget, risk assessments, design reviews, manufacturing reviews, negotiation of best price for components and PPAP readiness
Involve myself in the early stages of the product development to ensure all aspects of the process and internal requirements are linked to the customer solicitation
Achievements: Successfully implemented programs for Ford, AAM, Aptiv/GM and Stellantis while staying within budget and on time; budgets managed during these projects were up to $750k
Simultaneously manage the implementation of 8 programs: 3 capacity increase/demonstration, 2 improvements on current design, and 3 new designs.
Engineering Change Coordinator
Ted de México, S.A. de C.V.
06.2020 - 12.2020
Coordinate the implementation of engineering changes successfully within the agreed schedule and budget
Responsible for maintaining direct communication with the client, supplier and internal team while coordinating the activities that lead to a successful implementation following companies’ guidelines
Follow the APQP guidelines to satisfy Quality Assurance on the product
Achievements: Successfully implemented 4 large engineering changes for Ford (1), AAM (1) and GM (2) within budget and on time during July - December period
Successfully launched 2 new part numbers for Ford
NPI Engineer/ APQP Engineer
Ted de México, S.A. de C.V.
10.2017 - 06.2020
APQP management for NPI on Juarez Campus
Managed the communication between corporate (program manager) and Juarez Campus for all development of new product, transfer, or custom product request
Direct management of representatives of each department during the implementation of projects
Lead and coordinate the core team to develop all PPAP documentation to meet requirements
Coordinate and lead trial runs, gate/phase builds
Develop build reports and follow up on open action items; escalation process used to avoid delays
Review project status with upper management on detail
Achievements: Successfully launched multiple projects: 8 projects from Ford, 1 from AAM, 2 from FCA and 3 from Aptiv/GM
Sr. Product Engineer
Werner Ladder de México
06.2016 - 09.2017
APQP management for NPI on all Juarez Campus, which includes 4 facilities, 7 processes, 4 main categories of products (climbing product, fall protection, ladder truck rack and storage box)
Calculate and present capacity analysis for fabrication and manufacturing areas by providing an assessment of manufacturing feasibility and utilization analysis per equipment and production line
Analysis the BOM structure and product through drafts and assemblies on CAD software
Estimate output quantities using learning curves for new products according to complexity of the product and expertise of the personnel
Achievements: Successful introduction of 12 series of new products (total of 15 products) and 10 Special Products Requests
Successful implementation of more than 200 ECO on all Juarez Campus
Cost savings on existing product of $28.9k in 4 months through VAVE analysis; total saved amount of $85k by the end of 2017
Lead a project to reduce cost per EU on R&M storeroom Juarez Campus with expected savings of $140k by the end of 2017 through Six Sigma methodology
NPI Coordinator
Werner Ladder de México
11.2014 - 06.2016
APQP management for NPI on a diversity of products (climbing product, fall protection, ladder truck rack and storage box) presenting results to the Sr
Manager of Engineering and Maint
Department
Responsible for the capacity analysis on manufacturing providing an assessment of manufacturing feasibility for each area and process to the Sr
Manager of Engineering & Maint
Department
Responsible for presenting results on product validation - complying ANSI and OSHA through laboratory tests results
Coordination of ECO implementation in a determined timeframe and analysis for component deviation
Leading and Coordinating Sample builds, Engineering builds, Pre-Pilot and Pilot events for Juarez Campus
Coordinating movement of equipment and processes among Juarez Campuses
Participate in safety audits - Juarez Campus using STOP card assessment
Participate in internal audits on Juarez Campus and other divisions for ISO 9001:2008
Achievements: Successful introduction of 22 series of new products (total of 98 products), 7 series transferred from Maldon,UK, Louisville, KY and Crystal Lake, IL (total of 16 products) and 53 Special Products Requests
Development of a new production line for a new product in less than 3 months during the first quarter of 2016
Successful implementation of more than 200 ECO on all Juarez Campus
Development of procedures for New Product Introduction Juarez Campus during 2015 to strength the process and following ISO 9001:2008
Leader and implementer of 15 PARs during 2015
Implementer of 7 preventive actions and 3 process improvements based on STOP Cards results during 2016
Process & Quality Engineer
Werner Ladder de México
10.2009 - 11.2014
Receive and coordinate the introduction of NP on high and low volume area, providing technical support, developing processes, and calculating equipment capacity to ensure the success of the projects
Conduct supplier quality & process audits; follow up on suppliers’ action plans
In charge of all corrective and preventive actions to solve the quality issues of the plant using the 8D methodology, 5 Why´s and cause and effect diagram
Leader of 6 KAIZEN events focused on safety & Visual factory implementation
Leader on development of VSM for high volume area
Achievements: Lead project to reduce strapping cost per EU on high volume area with savings of $34k during 2012 through Six Sigma methodology
Success transfer of production lines & Equipment from Merced Facility to Juarez Facility providing technical support
Lead project to improve raw material usage on Pultrusion area with savings of $296k during 2011 through Six Sigma methodology
Successful implementation of ISO 9001:2008, developing documentation such MOS, VA, procedures, work instructions, etc
For Manufacturing and Engineering departments
Improvement on processes focused on safety operations rated RULA 7 to RULA 5 through KAIZEN events
Manufacturing & Process JR.
Werner Ladder de México
01.2008 - 10.2009
Implement first 3 S level on high volume area; this includes 15 production lines and 3 fabrication processes
Responsible for developing visual aids, time studies, line balances, flow diagrams for new products and existing products
Responsible for developing documentation for personnel training in order to standardize training and information
Production lines designed to improve output, draft of fixtures for tooling.
Control Documental Y Analista at Worley Engineering de México, S.A. de C.V. (Worley México)Control Documental Y Analista at Worley Engineering de México, S.A. de C.V. (Worley México)
Regulatory Affairs Specialist - MEXICO at Hill's Pet Nutrition de México S.A. de C.V.Regulatory Affairs Specialist - MEXICO at Hill's Pet Nutrition de México S.A. de C.V.