Obtain a position as a program manager to bring programs from concept into production. While at the same time implementing improvement on the process where I see fit by using my previous expertise in the subject.

Overview

16
16
years of professional experience

Work History

Program Manager

Ted de México, S.A. de C.V.
12.2020 - Current
  • Oversee the implementation of new products, process improvements and capacity demonstration successfully, following SPLP/APQP guidelines
  • Manage the relationship with the customers to understand their needs and wants, while leading a multidisciplinary team to ensure the delivered product met the customers’ expectations
  • Management and coordination of budget, risk assessments, design reviews, manufacturing reviews, negotiation of best price for components and PPAP readiness
  • Involve myself in the early stages of the product development to ensure all aspects of the process and internal requirements are linked to the customer solicitation
  • Achievements: Successfully implemented programs for Ford, AAM, Aptiv/GM and Stellantis while staying within budget and on time; budgets managed during these projects were up to $750k
  • Simultaneously manage the implementation of 8 programs: 3 capacity increase/demonstration, 2 improvements on current design, and 3 new designs.

Engineering Change Coordinator

Ted de México, S.A. de C.V.
06.2020 - 12.2020
  • Coordinate the implementation of engineering changes successfully within the agreed schedule and budget
  • Responsible for maintaining direct communication with the client, supplier and internal team while coordinating the activities that lead to a successful implementation following companies’ guidelines
  • Follow the APQP guidelines to satisfy Quality Assurance on the product
  • Achievements: Successfully implemented 4 large engineering changes for Ford (1), AAM (1) and GM (2) within budget and on time during July - December period
  • Successfully launched 2 new part numbers for Ford

NPI Engineer/ APQP Engineer

Ted de México, S.A. de C.V.
10.2017 - 06.2020
  • APQP management for NPI on Juarez Campus
  • Managed the communication between corporate (program manager) and Juarez Campus for all development of new product, transfer, or custom product request
  • Direct management of representatives of each department during the implementation of projects
  • Lead and coordinate the core team to develop all PPAP documentation to meet requirements
  • Coordinate and lead trial runs, gate/phase builds
  • Develop build reports and follow up on open action items; escalation process used to avoid delays
  • Review project status with upper management on detail
  • Achievements: Successfully launched multiple projects: 8 projects from Ford, 1 from AAM, 2 from FCA and 3 from Aptiv/GM

Sr. Product Engineer

Werner Ladder de México
06.2016 - 09.2017
  • APQP management for NPI on all Juarez Campus, which includes 4 facilities, 7 processes, 4 main categories of products (climbing product, fall protection, ladder truck rack and storage box)
  • Calculate and present capacity analysis for fabrication and manufacturing areas by providing an assessment of manufacturing feasibility and utilization analysis per equipment and production line
  • Analysis the BOM structure and product through drafts and assemblies on CAD software
  • Estimate output quantities using learning curves for new products according to complexity of the product and expertise of the personnel
  • Achievements: Successful introduction of 12 series of new products (total of 15 products) and 10 Special Products Requests
  • Successful implementation of more than 200 ECO on all Juarez Campus
  • Cost savings on existing product of $28.9k in 4 months through VAVE analysis; total saved amount of $85k by the end of 2017
  • Lead a project to reduce cost per EU on R&M storeroom Juarez Campus with expected savings of $140k by the end of 2017 through Six Sigma methodology

NPI Coordinator

Werner Ladder de México
11.2014 - 06.2016
  • APQP management for NPI on a diversity of products (climbing product, fall protection, ladder truck rack and storage box) presenting results to the Sr
  • Manager of Engineering and Maint
  • Department
  • Responsible for the capacity analysis on manufacturing providing an assessment of manufacturing feasibility for each area and process to the Sr
  • Manager of Engineering & Maint
  • Department
  • Responsible for presenting results on product validation - complying ANSI and OSHA through laboratory tests results
  • Coordination of ECO implementation in a determined timeframe and analysis for component deviation
  • Leading and Coordinating Sample builds, Engineering builds, Pre-Pilot and Pilot events for Juarez Campus
  • Coordinating movement of equipment and processes among Juarez Campuses
  • Participate in safety audits - Juarez Campus using STOP card assessment
  • Participate in internal audits on Juarez Campus and other divisions for ISO 9001:2008
  • Achievements: Successful introduction of 22 series of new products (total of 98 products), 7 series transferred from Maldon,UK, Louisville, KY and Crystal Lake, IL (total of 16 products) and 53 Special Products Requests
  • Development of a new production line for a new product in less than 3 months during the first quarter of 2016
  • Successful implementation of more than 200 ECO on all Juarez Campus
  • Development of procedures for New Product Introduction Juarez Campus during 2015 to strength the process and following ISO 9001:2008
  • Leader and implementer of 15 PARs during 2015
  • Implementer of 7 preventive actions and 3 process improvements based on STOP Cards results during 2016

Process & Quality Engineer

Werner Ladder de México
10.2009 - 11.2014
  • Receive and coordinate the introduction of NP on high and low volume area, providing technical support, developing processes, and calculating equipment capacity to ensure the success of the projects
  • Conduct supplier quality & process audits; follow up on suppliers’ action plans
  • In charge of all corrective and preventive actions to solve the quality issues of the plant using the 8D methodology, 5 Why´s and cause and effect diagram
  • Leader of 6 KAIZEN events focused on safety & Visual factory implementation
  • Leader on development of VSM for high volume area
  • Achievements: Lead project to reduce strapping cost per EU on high volume area with savings of $34k during 2012 through Six Sigma methodology
  • Success transfer of production lines & Equipment from Merced Facility to Juarez Facility providing technical support
  • Lead project to improve raw material usage on Pultrusion area with savings of $296k during 2011 through Six Sigma methodology
  • Successful implementation of ISO 9001:2008, developing documentation such MOS, VA, procedures, work instructions, etc
  • For Manufacturing and Engineering departments
  • Improvement on processes focused on safety operations rated RULA 7 to RULA 5 through KAIZEN events

Manufacturing & Process JR.

Werner Ladder de México
01.2008 - 10.2009
  • Implement first 3 S level on high volume area; this includes 15 production lines and 3 fabrication processes
  • Responsible for developing visual aids, time studies, line balances, flow diagrams for new products and existing products
  • Responsible for developing documentation for personnel training in order to standardize training and information
  • Production lines designed to improve output, draft of fixtures for tooling.

Education

Industrial Engineering

Instituto Tecnologico De Ciudad Juarez
Ciudad Juarez
12-2007

Skills

  • Project Management

Knowledge And Skills

  • Dale Carnegie’s leadership road
  • Lean manufacturing Tools
  • 5S + Security
  • SMED
  • TPM
  • Ergonomics
  • MOST
  • KAIZEN
  • KAN BAN
  • AutoCAD/Draftshight – Expert
  • Solid Works – Intermediate
  • MS Project – Expert
  • Visio – Expert
  • JD Edwards - Expert
  • DFMEA - Intermediate
  • PFMEA – Expert
  • Control Plan - Intermediate
  • Lean 6 Sigma – Green Belt
  • ISO 9001:2008 -Intern auditor
  • TIG/MIG Welding – Certified

Timeline

Program Manager

Ted de México, S.A. de C.V.
12.2020 - Current

Engineering Change Coordinator

Ted de México, S.A. de C.V.
06.2020 - 12.2020

NPI Engineer/ APQP Engineer

Ted de México, S.A. de C.V.
10.2017 - 06.2020

Sr. Product Engineer

Werner Ladder de México
06.2016 - 09.2017

NPI Coordinator

Werner Ladder de México
11.2014 - 06.2016

Process & Quality Engineer

Werner Ladder de México
10.2009 - 11.2014

Manufacturing & Process JR.

Werner Ladder de México
01.2008 - 10.2009

Industrial Engineering

Instituto Tecnologico De Ciudad Juarez
Veronica Ceballos Ramirez