Focused on the planning, installing, and commissioning the necessary infrastructure for telecommunications networks in the Mexico City metro. Working with Huawei, I was part of the team responsible for installing the telecommunications infrastructure in the Mexico City metro system. During this project, I ensured the implementation of advanced technology and maintained the operability of the system, minimizing any negative impact on the users.
Remodeling of Torre Mayor in Mexico City: In this key project, I was responsible for supervising the structural review and the implementation of energy efficiency strategies. Additionally, I coordinated the installation of a closed circuit with CCTV cameras, ensuring the integration of state-of-the-art security technology in the building. I used tools such as AutoCAD, Revit, BIM software, and SAP2000 for the development of mathematical models.
As a Structural Analyst at Grupo INK, my role was essential in evaluating and analyzing the structural stability of various buildings. I used SAP2000 to develop precise mathematical models that simulate structural behavior under various conditions, ensuring safety and compliance with regulations at all times.
As Project Delivery Manager at CAID, I was responsible for leading the full lifecycle of projects, from planning to final delivery. My responsibilities included:
As an Assistant Site Manager, I played a key role in the management and supervision of construction projects, supporting the lead site manager with the following activities.